Insulation
The siding is nearly complete I think the red will be even more stunning in the fall. You have not experienced the fall colors until you have seen them from Saddle Ridge. We have done the first step of the energy seal process and are now installing the batt insulation. The drywall process will take almost 2 weeks and we will be priming soon after that. Your home is really taking shape now!
Posted by
SADDLE RIDGE TEAM
|
|
7
comments
Your home is really taking shape now, the framing is complete and the roof is on. The rough mechanicals are going in now with our framing punch and energy seal process as soon as they are complete. After the rough inspections we will be insulating then drywall. On the exterior The windows will be installed then the trim around them. We paint the exterior before we install the vinyl siding to make sure we get complete coverage.
Posted by
SADDLE RIDGE TEAM
|
Labels:
Framing Completed
|
0
comments
Your new home is really taking shape! Both floors and walls are standing with the trusses laying on top. Once the trusses go up you will get a better feel for the size and the shape of your home. The windows in your Great Room will allow you to take advantage of the great view out back. John and his crew are one of our finest subcontractors. They should be wrapped up this week so we can start the mechanicals.
Posted by
SADDLE RIDGE TEAM
|
|
0
comments


The framing has started! John, Bobby and the rest of the crew have the first floor deck on and a few of the walls standing. The home should be framed in about another week and a half. After the framing the mechanicals will begin. If you visit the site please be careful especially around the stair openings.
Posted by
SADDLE RIDGE TEAM
|
|
0
comments
Backfill
It does not look very exciting, but the waterproofing and drainage system are in and sand is going in the garage. Still looking to start framing mid February!
Posted by
SADDLE RIDGE TEAM
|
|
1 comments
Getting Started
Your foundation was dug on the 21st! After the footings and walls are poured we will have the waterproofing and drainage system installed. After a curing period we will backfill and with a little cooperation from the weather we will be framing in the middle of February. Great view out the back! Chris has been seeing wild turkeys out there.
Posted by
SADDLE RIDGE TEAM
|
|
0
comments